North America
Osisko Development Brief: Initial Infill Drilling at QR Mine Prospect, Cariboo Gold Project
• Osisko Development Brief reports the initiation of 13.61 g/t gold over 4.15 meters in initial infill drilling at QR Mine Prospect, Cariboo Gold Project.
• The initial infill drilling was conducted at the QR Mine Prospect, Cariboo Gold Project.
• The company’s initial production was a total of 13.61 g/t gold.
• The initial production was a significant milestone for the company, with the company aiming to increase its production from a total of 4.5 million tonnes to a total of 5.5 million tonnes.
• The company’s operations are expected to contribute significantly to the country’s gold production.